Power Station - Ccgt
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - Ccgt
Actual Power
14 November 2019 00:00:00
CO2 emissions
0 MW installed: 552 MW -
0 MW installed: 552 MW -
BAGE-1 0 MW nominal: 520 MW -
BAGE-2 0 MW nominal: 32 MW -
BAGE-1 0 MW nominal: 520 MW -
BAGE-2 0 MW nominal: 32 MW -
0 MW installed: 150 MW -
0 MW installed: 150 MW -
BRGG-1 0 MW nominal: 150 MW -
BRGG-1 0 MW nominal: 150 MW -
0 MW installed: 245 MW -
0 MW installed: 245 MW -
BRYP-1 unknown nominal: 140 MW -
BRYP-1 unknown nominal: 140 MW -
0 MW installed: 440 MW -
5 MW installed: 440 MW -
CDCL-1 0 MW nominal: 440 MW -
CDCL-1 5 MW nominal: 440 MW -
0 MW installed: 1,500 MW -
230 MW installed: 1,500 MW -
CNQPS-1 0 MW nominal: 375 MW -
CNQPS-2 0 MW nominal: 375 MW -
CNQPS-3 0 MW nominal: 375 MW -
CNQPS-4 0 MW nominal: 375 MW -
CNQPS-1 116 MW nominal: 375 MW -
CNQPS-2 unknown nominal: 375 MW -
CNQPS-3 114 MW nominal: 375 MW -
CNQPS-4 unknown nominal: 375 MW -
0 MW installed: 401 MW -
0 MW installed: 401 MW -
CORB-1 0 MW nominal: 401 MW -
CORB-1 unknown nominal: 401 MW -
0 MW installed: 800 MW -
221 MW installed: 800 MW -
COSO-1 0 MW nominal: 800 MW -
COSO-1 221 MW nominal: 800 MW -
0 MW installed: 805 MW -
0 MW installed: 805 MW -
DAMC-1 0 MW nominal: 805 MW -
DAMC-1 0 MW nominal: 805 MW -
0 MW installed: 260 MW -
0 MW installed: 260 MW -
DEEP-1 unknown nominal: 528 MW -
DEEP-1 unknown nominal: 528 MW -
0 MW installed: 236 MW -
0 MW installed: 236 MW -
DERW-1 0 MW nominal: 236 MW -
DERW-1 unknown nominal: 236 MW -
0 MW installed: 1,490 MW -
412 MW installed: 1,490 MW -
DIDCB5 0 MW nominal: 780 MW -
DIDCB6 0 MW nominal: 710 MW -
DIDCB5 352 MW nominal: 780 MW -
DIDCB6 60 MW nominal: 710 MW -
0 MW installed: 408 MW -
0 MW installed: 408 MW -
EECL-1 0 MW nominal: 408 MW -
EECL-1 unknown nominal: 408 MW -
132 MW installed: 150 MW -
132 MW installed: 150 MW -
FAWN-1 132 MW nominal: 150 MW -
FAWN-1 132 MW nominal: 150 MW -
0 MW installed: 180 MW -
0 MW installed: 180 MW -
FELL-1 0 MW nominal: 180 MW -
FELL-1 unknown nominal: 180 MW -
0 MW installed: 1,365 MW -
587 MW installed: 1,365 MW -
GRAI-6 0 MW nominal: 455 MW -
GRAI-7 0 MW nominal: 455 MW -
GRAI-8 0 MW nominal: 455 MW -
GRAI-6 233 MW nominal: 455 MW -
GRAI-7 226 MW nominal: 455 MW -
GRAI-8 128 MW nominal: 455 MW -
140 MW installed: 144 MW -
125 MW installed: 144 MW -
GRMO-1 140 MW nominal: 144 MW -
GRMO-1 125 MW nominal: 144 MW -
406 MW installed: 420 MW -
357 MW installed: 420 MW -
GYAR-1 406 MW nominal: 420 MW -
GYAR-1 357 MW nominal: 420 MW -
875 MW installed: 1,240 MW -
927 MW installed: 1,240 MW -
HUMR-1 875 MW nominal: 1,240 MW -
HUMR-1 927 MW nominal: 1,240 MW -
0 MW installed: 764 MW -
256 MW installed: 764 MW -
KEAD-1 0 MW nominal: 764 MW -
KEAD-1 256 MW nominal: 764 MW -
0 MW installed: 1,000 MW -
0 MW installed: 1,000 MW -
KILLPG-1 0 MW nominal: 500 MW -
KILLPG-2 0 MW nominal: 500 MW -
KILLPG-1 unknown nominal: 500 MW -
KILLPG-2 unknown nominal: 500 MW -
0 MW installed: 665 MW -
0 MW installed: 665 MW -
KILNS-1 0 MW nominal: 665 MW -
KILNS-1 unknown nominal: 665 MW -
0 MW installed: 905 MW -
0 MW installed: 905 MW -
LAGA-1 0 MW nominal: 905 MW -
LAGA-1 0 MW nominal: 905 MW -
0 MW installed: 735 MW -
0 MW installed: 735 MW -
LBAR-1 0 MW nominal: 735 MW -
LBAR-1 0 MW nominal: 735 MW -
0 MW installed: 700 MW -
0 MW installed: 700 MW -
MEDP-1 0 MW nominal: 700 MW -
MEDP-1 0 MW nominal: 700 MW -
600 MW installed: 920 MW -
146 MW installed: 920 MW -
MRWD-1 600 MW nominal: 920 MW -
MRWD-1 146 MW nominal: 920 MW -
380 MW installed: 1,840 MW -
371 MW installed: 1,840 MW -
PEHE-1 380 MW nominal: 1,180 MW -
PEHE-2 0 MW nominal: 660 MW -
PEHE-1 371 MW nominal: 1,180 MW -
PEHE-2 unknown nominal: 660 MW -
0 MW installed: 2,305 MW -
622 MW installed: 2,305 MW -
PEMB-11 0 MW nominal: 445 MW -
PEMB-21 0 MW nominal: 445 MW -
PEMB-31 0 MW nominal: 445 MW -
PEMB-41 0 MW nominal: 445 MW -
PEMB-51 0 MW nominal: 445 MW -
PEMB-11 151 MW nominal: 445 MW -
PEMB-21 unknown nominal: 445 MW -
PEMB-31 165 MW nominal: 445 MW -
PEMB-41 180 MW nominal: 445 MW -
PEMB-51 125 MW nominal: 445 MW -
0 MW installed: 240 MW -
0 MW installed: 240 MW -
PETEM1 0 MW nominal: 240 MW -
PETEM1 unknown nominal: 240 MW -
0 MW installed: 830 MW -
295 MW installed: 830 MW -
ROCK-1 0 MW nominal: 830 MW -
ROCK-1 295 MW nominal: 830 MW -
0 MW installed: 715 MW -
0 MW installed: 715 MW -
RYHPS-1 0 MW nominal: 715 MW -
RYHPS-1 0 MW nominal: 715 MW -
770 MW installed: 1,200 MW -
913 MW installed: 1,200 MW -
SCCL-1 0 MW nominal: 400 MW -
SCCL-2 385 MW nominal: 400 MW -
SCCL-3 385 MW nominal: 400 MW -
SCCL-1 301 MW nominal: 400 MW -
SCCL-2 296 MW nominal: 400 MW -
SCCL-3 316 MW nominal: 400 MW -
0 MW installed: 1,258 MW -
0 MW installed: 1,258 MW -
SEAB-1 0 MW nominal: 836 MW -
SEAB-2 0 MW nominal: 422 MW -
SEAB-1 0 MW nominal: 836 MW -
SEAB-2 0 MW nominal: 422 MW -
800 MW installed: 810 MW -
560 MW installed: 810 MW -
SHBA-1 800 MW nominal: 810 MW -
SHBA-1 560 MW nominal: 810 MW -
543 MW installed: 580 MW -
420 MW installed: 580 MW -
SHBA-2 543 MW nominal: 580 MW -
SHBA-2 420 MW nominal: 580 MW -
0 MW installed: 420 MW -
289 MW installed: 420 MW -
SHOS-1 0 MW nominal: 420 MW -
SHOS-1 289 MW nominal: 420 MW -
0 MW installed: 903 MW -
747 MW installed: 903 MW -
SPLN-1 0 MW nominal: 903 MW -
SPLN-1 747 MW nominal: 903 MW -
0 MW installed: 1,828 MW -
672 MW installed: 1,828 MW -
STAY-1 0 MW nominal: 445 MW -
STAY-2 0 MW nominal: 457 MW -
STAY-3 0 MW nominal: 457 MW -
STAY-4 0 MW nominal: 457 MW -
STAY-1 146 MW nominal: 445 MW -
STAY-2 197 MW nominal: 457 MW -
STAY-3 158 MW nominal: 457 MW -
STAY-4 171 MW nominal: 457 MW -
0 MW installed: 819 MW -
176 MW installed: 819 MW -
SUTB-1 0 MW nominal: 819 MW -
SUTB-1 176 MW nominal: 819 MW -
0 MW installed: 850 MW -
266 MW installed: 850 MW -
SVRP-10 0 MW nominal: 425 MW -
SVRP-20 0 MW nominal: 425 MW -
SVRP-10 228 MW nominal: 425 MW -
SVRP-20 38 MW nominal: 425 MW -
0 MW installed: 1,315 MW -
837 MW installed: 1,315 MW -
WBURB-1 0 MW nominal: 450 MW -
WBURB-2 0 MW nominal: 460 MW -
WBURB-3 0 MW nominal: 450 MW -
WBURB-1 301 MW nominal: 450 MW -
WBURB-2 286 MW nominal: 460 MW -
WBURB-3 250 MW nominal: 450 MW -
Power Station - Ocgt
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - Ocgt
Actual Power
14 November 2019 00:00:00
CO2 emissions
0 MW installed: 51 MW -
0 MW installed: 51 MW -
ABTH7G 0 MW nominal: 17 MW -
ABTH8G 0 MW nominal: 17 MW -
ABTH9G 0 MW nominal: 17 MW -
ABTH7G unknown nominal: 17 MW -
ABTH8G unknown nominal: 17 MW -
ABTH9G unknown nominal: 17 MW -
0 MW installed: 100 MW -
0 MW installed: 100 MW -
COWE1 0 MW nominal: 50 MW -
COWE2 0 MW nominal: 50 MW -
COWE1 unknown nominal: 50 MW -
COWE2 unknown nominal: 50 MW -
0 MW installed: 100 MW -
0 MW installed: 100 MW -
DIDC01G 0 MW nominal: 25 MW -
DIDC02G 0 MW nominal: 25 MW -
DIDC03G 0 MW nominal: 25 MW -
DIDC04G 0 MW nominal: 25 MW -
DIDC01G 0 MW nominal: 25 MW -
DIDC02G 0 MW nominal: 25 MW -
DIDC03G 0 MW nominal: 25 MW -
DIDC04G 0 MW nominal: 25 MW -
0 MW installed: 96 MW -
0 MW installed: 96 MW -
DRAXX-10G 0 MW nominal: 32 MW -
DRAXX-12G 0 MW nominal: 32 MW -
DRAXX-9G 0 MW nominal: 32 MW -
DRAXX-10G unknown nominal: 32 MW -
DRAXX-12G unknown nominal: 32 MW -
DRAXX-9G unknown nominal: 32 MW -
0 MW installed: 34 MW -
0 MW installed: 34 MW -
FIDL-2G 0 MW nominal: 17 MW -
FIDL-3G 0 MW nominal: 17 MW -
FIDL-2G unknown nominal: 17 MW -
FIDL-3G unknown nominal: 17 MW -
0 MW installed: 58 MW -
0 MW installed: 58 MW -
GRAI1G 0 MW nominal: 29 MW -
GRAI4G 0 MW nominal: 29 MW -
GRAI1G unknown nominal: 29 MW -
GRAI4G unknown nominal: 29 MW -
0 MW installed: 140 MW -
0 MW installed: 140 MW -
INDQ-1 0 MW nominal: 140 MW -
INDQ-1 0 MW nominal: 140 MW -
0 MW installed: 30 MW -
0 MW installed: 30 MW -
KEADGT-3 0 MW nominal: 30 MW -
KEADGT-3 unknown nominal: 30 MW -
0 MW installed: 17 MW -
0 MW installed: 17 MW -
LBAR-1G 0 MW nominal: 17 MW -
LBAR-1G unknown nominal: 17 MW -
0 MW installed: 34 MW -
0 MW installed: 34 MW -
RATSGT-2 0 MW nominal: 17 MW -
RATSGT-4 0 MW nominal: 17 MW -
RATSGT-2 unknown nominal: 17 MW -
RATSGT-4 unknown nominal: 17 MW -
0 MW installed: 50 MW -
0 MW installed: 50 MW -
RUGGT-6 0 MW nominal: 25 MW -
RUGGT-7 0 MW nominal: 25 MW -
RUGGT-6 unknown nominal: 25 MW -
RUGGT-7 unknown nominal: 25 MW -
0 MW installed: 144 MW -
0 MW installed: 144 MW -
TAYL2G 0 MW nominal: 72 MW -
TAYL3G 0 MW nominal: 72 MW -
TAYL2G unknown nominal: 72 MW -
TAYL3G unknown nominal: 72 MW -
0 MW installed: 40 MW -
0 MW installed: 40 MW -
WBUGT-1 0 MW nominal: 20 MW -
WBUGT-4 0 MW nominal: 20 MW -
WBUGT-1 unknown nominal: 20 MW -
WBUGT-4 unknown nominal: 20 MW -
Power Station - Coal
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - Coal
Actual Power
14 November 2019 00:00:00
CO2 emissions
430 MW installed: 1,590 MW -
296 MW installed: 1,590 MW -
ABTH7 0 MW nominal: 535 MW -
ABTH8 0 MW nominal: 535 MW -
ABTH9 430 MW nominal: 524 MW -
ABTH7 unknown nominal: 535 MW -
ABTH8 unknown nominal: 535 MW -
ABTH9 296 MW nominal: 524 MW -
0 MW installed: 1,994 MW -
0 MW installed: 1,994 MW -
COTPS-1 0 MW nominal: 497 MW -
COTPS-2 0 MW nominal: 507 MW -
COTPS-3 0 MW nominal: 507 MW -
COTPS-4 0 MW nominal: 497 MW -
COTPS-1 unknown nominal: 497 MW -
COTPS-2 unknown nominal: 507 MW -
COTPS-3 unknown nominal: 507 MW -
COTPS-4 unknown nominal: 497 MW -
1,775 MW installed: 3,870 MW -
2,476 MW installed: 3,870 MW -
DRAXX-1 660 MW nominal: 645 MW -
DRAXX-2 470 MW nominal: 645 MW -
DRAXX-3 645 MW nominal: 645 MW -
DRAXX-4 0 MW nominal: 645 MW -
DRAXX-5 0 MW nominal: 645 MW -
DRAXX-6 0 MW nominal: 645 MW -
DRAXX-1 658 MW nominal: 645 MW -
DRAXX-2 531 MW nominal: 645 MW -
DRAXX-3 642 MW nominal: 645 MW -
DRAXX-4 645 MW nominal: 645 MW -
DRAXX-5 0 MW nominal: 645 MW -
DRAXX-6 unknown nominal: 645 MW -
0 MW installed: 2,100 MW -
0 MW installed: 2,100 MW -
EGGPS-1 unknown nominal: 525 MW -
EGGPS-2 unknown nominal: 525 MW -
EGGPS-3 unknown nominal: 525 MW -
EGGPS-4 unknown nominal: 525 MW -
EGGPS-1 unknown nominal: 525 MW -
EGGPS-2 unknown nominal: 525 MW -
EGGPS-3 unknown nominal: 525 MW -
EGGPS-4 unknown nominal: 525 MW -
300 MW installed: 1,961 MW -
636 MW installed: 1,961 MW -
FIDL-1 0 MW nominal: 485 MW -
FIDL-2 0 MW nominal: 485 MW -
FIDL-3 300 MW nominal: 485 MW -
FIDL-4 0 MW nominal: 506 MW -
FIDL-1 unknown nominal: 485 MW -
FIDL-2 unknown nominal: 485 MW -
FIDL-3 236 MW nominal: 485 MW -
FIDL-4 400 MW nominal: 506 MW -
0 MW installed: 2,020 MW -
0 MW installed: 2,020 MW -
RATS-1 0 MW nominal: 505 MW -
RATS-2 0 MW nominal: 505 MW -
RATS-3 0 MW nominal: 505 MW -
RATS-4 0 MW nominal: 505 MW -
RATS-1 0 MW nominal: 505 MW -
RATS-2 0 MW nominal: 505 MW -
RATS-3 unknown nominal: 505 MW -
RATS-4 0 MW nominal: 505 MW -
0 MW installed: 121 MW -
0 MW installed: 121 MW -
USKM-13 0 MW nominal: 121 MW -
USKM-14 0 MW nominal: 121 MW -
USKM-15 0 MW nominal: 121 MW -
USKM-13 unknown nominal: 121 MW -
USKM-14 unknown nominal: 121 MW -
USKM-15 unknown nominal: 121 MW -
0 MW installed: 1,944 MW -
267 MW installed: 1,944 MW -
WBUPS-1 0 MW nominal: 503 MW -
WBUPS-2 0 MW nominal: 503 MW -
WBUPS-3 0 MW nominal: 503 MW -
WBUPS-4 0 MW nominal: 503 MW -
WBUPS-1 213 MW nominal: 503 MW -
WBUPS-2 54 MW nominal: 503 MW -
WBUPS-3 0 MW nominal: 503 MW -
WBUPS-4 0 MW nominal: 503 MW -
Power Station - Nuclear
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - Nuclear
Actual Power
14 November 2019 00:00:00
CO2 emissions
0 MW installed: 1,050 MW -
0 MW installed: 1,050 MW -
DNGB21 0 MW nominal: 660 MW -
DNGB22 0 MW nominal: 660 MW -
DNGB21 unknown nominal: 660 MW -
DNGB22 unknown nominal: 660 MW -
511 MW installed: 1,155 MW -
511 MW installed: 1,155 MW -
HEYM11 0 MW nominal: 666 MW -
HEYM12 511 MW nominal: 666 MW -
HEYM11 unknown nominal: 666 MW -
HEYM12 511 MW nominal: 666 MW -
1,270 MW installed: 1,230 MW -
1,274 MW installed: 1,230 MW -
HEYM27 648 MW nominal: 672 MW -
HEYM28 622 MW nominal: 672 MW -
HEYM27 651 MW nominal: 672 MW -
HEYM28 623 MW nominal: 672 MW -
994 MW installed: 955 MW -
824 MW installed: 955 MW -
HINB-7 501 MW nominal: 700 MW -
HINB-8 493 MW nominal: 700 MW -
HINB-7 498 MW nominal: 700 MW -
HINB-8 326 MW nominal: 700 MW -
1,194 MW installed: 1,180 MW -
770 MW installed: 1,180 MW -
HRTL-1 600 MW nominal: 666 MW -
HRTL-2 594 MW nominal: 666 MW -
HRTL-1 584 MW nominal: 666 MW -
HRTL-2 186 MW nominal: 666 MW -
508 MW installed: 965 MW -
508 MW installed: 965 MW -
HUNB-7 0 MW nominal: 660 MW -
HUNB-8 508 MW nominal: 660 MW -
HUNB-7 unknown nominal: 660 MW -
HUNB-8 508 MW nominal: 660 MW -
1,202 MW installed: 1,198 MW -
1,201 MW installed: 1,198 MW -
SIZB-1 601 MW nominal: 660 MW -
SIZB-2 601 MW nominal: 660 MW -
SIZB-1 600 MW nominal: 660 MW -
SIZB-2 600 MW nominal: 660 MW -
1,270 MW installed: 1,185 MW -
845 MW installed: 1,185 MW -
TORN-1 626 MW nominal: 685 MW -
TORN-2 644 MW nominal: 685 MW -
TORN-1 626 MW nominal: 685 MW -
TORN-2 219 MW nominal: 685 MW -
Power Station - WindOnshore
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - WindOnshore
Actual Power
14 November 2019 00:00:00
CO2 emissions
16 MW installed: 19 MW -
2 MW installed: 19 MW -
ANSUW-1 16 MW nominal: 19 MW -
ANSUW-1 2 MW nominal: 19 MW -
11 MW installed: 74 MW -
18 MW installed: 74 MW -
BRDUW-1 11 MW nominal: 72 MW -
BRDUW-1 18 MW nominal: 72 MW -
0 MW installed: 48 MW -
0 MW installed: 48 MW -
CAUSW-1 unknown nominal: 48 MW -
CAUSW-1 unknown nominal: 48 MW -
180 MW installed: 112 MW -
46 MW installed: 112 MW -
CLDCW-1 180 MW nominal: 112 MW -
CLDCW-1 46 MW nominal: 112 MW -
164 MW installed: 108 MW -
61 MW installed: 108 MW -
CLDNW-1 164 MW nominal: 108 MW -
CLDNW-1 61 MW nominal: 108 MW -
0 MW installed: 128 MW -
18 MW installed: 128 MW -
CLDSW-1 0 MW nominal: 128 MW -
CLDSW-1 18 MW nominal: 128 MW -
92 MW installed: 140 MW -
1 MW installed: 140 MW -
FAARW-1 46 MW nominal: 70 MW -
FAARW-2 46 MW nominal: 70 MW -
FAARW-1 0 MW nominal: 70 MW -
FAARW-2 1 MW nominal: 70 MW -
0 MW installed: 99 MW -
0 MW installed: 99 MW -
FDUNT-1 0 MW nominal: 99 MW -
FDUNT-1 0 MW nominal: 99 MW -
8 MW installed: 32 MW -
9 MW installed: 32 MW -
GFLDW-1 8 MW nominal: 32 MW -
GFLDW-1 9 MW nominal: 32 MW -
18 MW installed: 26 MW -
1 MW installed: 26 MW -
GLOFW-1 18 MW nominal: 26 MW -
GLOFW-1 1 MW nominal: 26 MW -
50 MW installed: 70 MW -
11 MW installed: 70 MW -
GORDW-1 50 MW nominal: 70 MW -
GORDW-1 11 MW nominal: 70 MW -
140 MW installed: 204 MW -
21 MW installed: 204 MW -
GRIFW-1 60 MW nominal: 102 MW -
GRIFW-2 80 MW nominal: 102 MW -
GRIFW-1 12 MW nominal: 102 MW -
GRIFW-2 9 MW nominal: 102 MW -
60 MW installed: 130 MW -
19 MW installed: 130 MW -
HADHW-1 60 MW nominal: 130 MW -
HADHW-1 19 MW nominal: 130 MW -
221 MW installed: 228 MW -
57 MW installed: 228 MW -
KLGLW-1 221 MW nominal: 228 MW -
KLGLW-1 57 MW nominal: 228 MW -
358 MW installed: 382 MW -
333 MW installed: 382 MW -
WDNSO-1 179 MW nominal: 191 MW -
WDNSO-2 179 MW nominal: 191 MW -
WDNSO-1 171 MW nominal: 191 MW -
WDNSO-2 162 MW nominal: 191 MW -
Power Station - WindOffshore
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - WindOffshore
Actual Power
14 November 2019 00:00:00
CO2 emissions
252 MW installed: 254 MW -
236 MW installed: 254 MW -
BRBEO-1 252 MW nominal: 254 MW -
BRBEO-1 236 MW nominal: 254 MW -
0 MW installed: 590 MW -
0 MW installed: 590 MW -
GYMRW-1 unknown nominal: 295 MW -
GYMRW-2 unknown nominal: 295 MW -
GYMRW-1 unknown nominal: 295 MW -
GYMRW-2 unknown nominal: 295 MW -
230 MW installed: 270 MW -
163 MW installed: 270 MW -
LNCSO-1 109 MW nominal: 129 MW -
LNCSO-2 121 MW nominal: 140 MW -
LNCSW-3 unknown nominal: 250 MW -
LNCSO-1 76 MW nominal: 129 MW -
LNCSO-2 87 MW nominal: 140 MW -
LNCSW-3 unknown nominal: 250 MW -
0 MW installed: 60 MW -
0 MW installed: 60 MW -
NHOYW-1 unknown nominal: 60 MW -
NHOYW-1 unknown nominal: 60 MW -
0 MW installed: 90 MW -
0 MW installed: 90 MW -
RHYFW-1 unknown nominal: 90 MW -
RHYFW-1 unknown nominal: 90 MW -
0 MW installed: 300 MW -
0 MW installed: 300 MW -
THNTW-1 unknown nominal: 150 MW -
THNTW-2 unknown nominal: 150 MW -
THNTW-1 unknown nominal: 150 MW -
THNTW-2 unknown nominal: 150 MW -
Power Station - Wind
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - Wind
Actual Power
14 November 2019 00:00:00
CO2 emissions
64 MW installed: 120 MW -
7 MW installed: 120 MW -
ARCHW-1 64 MW nominal: 120 MW -
ARCHW-1 7 MW nominal: 120 MW -
46 MW installed: 52 MW -
1 MW installed: 52 MW -
BABAW-1 46 MW nominal: 52 MW -
BABAW-1 1 MW nominal: 52 MW -
39 MW installed: 109 MW -
13 MW installed: 109 MW -
BEINW-1 39 MW nominal: 109 MW -
BEINW-1 13 MW nominal: 109 MW -
0 MW installed: 134 MW -
18 MW installed: 134 MW -
BLLA-1 0 MW nominal: 134 MW -
BLLA-1 18 MW nominal: 134 MW -
0 MW installed: 28 MW -
0 MW installed: 28 MW -
BNAKW-1 unknown nominal: 28 MW -
BNAKW-1 unknown nominal: 28 MW -
80 MW installed: 90 MW -
70 MW installed: 90 MW -
BOWLW-1 80 MW nominal: 90 MW -
BOWLW-1 70 MW nominal: 90 MW -
0 MW installed: 22 MW -
0 MW installed: 22 MW -
BOYNW-1 unknown nominal: 22 MW -
BOYNW-1 unknown nominal: 22 MW -
50 MW installed: 66 MW -
0 MW installed: 66 MW -
BRYBW-1 50 MW nominal: 66 MW -
BRYBW-1 0 MW nominal: 66 MW -
79 MW installed: 90 MW -
67 MW installed: 90 MW -
BURBW-1 79 MW nominal: 90 MW -
BURBW-1 67 MW nominal: 90 MW -
35 MW installed: 42 MW -
1 MW installed: 42 MW -
CAIRW-2 35 MW nominal: 42 MW -
CAIRW-2 1 MW nominal: 42 MW -
49 MW installed: 51 MW -
0 MW installed: 51 MW -
CAIRW-1 49 MW nominal: 51 MW -
CAIRW-1 unknown nominal: 51 MW -
36 MW installed: 46 MW -
1 MW installed: 46 MW -
CRGHW-1 36 MW nominal: 46 MW -
CRGHW-1 1 MW nominal: 46 MW -
133 MW installed: 200 MW -
2 MW installed: 200 MW -
CRYRW-2 133 MW nominal: 200 MW -
CRYRW-2 2 MW nominal: 200 MW -
0 MW installed: 63 MW -
0 MW installed: 63 MW -
CRYRW-1 unknown nominal: 63 MW -
CRYRW-1 unknown nominal: 63 MW -
26 MW installed: 30 MW -
10 MW installed: 30 MW -
DALSW-1 26 MW nominal: 30 MW -
DALSW-1 10 MW nominal: 30 MW -
293 MW installed: 402 MW -
174 MW installed: 402 MW -
DDGNO-1 81 MW nominal: 108 MW -
DDGNO-2 67 MW nominal: 90 MW -
DDGNO-3 71 MW nominal: 102 MW -
DDGNO-4 74 MW nominal: 102 MW -
DDGNO-1 43 MW nominal: 108 MW -
DDGNO-2 43 MW nominal: 90 MW -
DDGNO-3 48 MW nominal: 102 MW -
DDGNO-4 40 MW nominal: 102 MW -
0 MW installed: 16 MW -
0 MW installed: 16 MW -
DEUCW-1 unknown nominal: 16 MW -
DEUCW-1 unknown nominal: 16 MW -
0 MW installed: 32 MW -
0 MW installed: 32 MW -
DRDGW-1 unknown nominal: 32 MW -
DRDGW-1 unknown nominal: 32 MW -
0 MW installed: 35 MW -
0 MW installed: 35 MW -
EARBW-1 unknown nominal: 35 MW -
EARBW-1 unknown nominal: 35 MW -
8 MW installed: 42 MW -
2 MW installed: 42 MW -
EDINW-1 8 MW nominal: 42 MW -
EDINW-1 2 MW nominal: 42 MW -
109 MW installed: 144 MW -
2 MW installed: 144 MW -
FALGW-1 109 MW nominal: 144 MW -
FALGW-1 2 MW nominal: 144 MW -
252 MW installed: 352 MW -
0 MW installed: 352 MW -
GAOFO-1 61 MW nominal: 88 MW -
GAOFO-2 64 MW nominal: 88 MW -
GAOFO-3 64 MW nominal: 88 MW -
GAOFO-4 63 MW nominal: 88 MW -
GAOFO-1 unknown nominal: 88 MW -
GAOFO-2 unknown nominal: 88 MW -
GAOFO-3 unknown nominal: 88 MW -
GAOFO-4 unknown nominal: 88 MW -
12 MW installed: 13 MW -
0 MW installed: 13 MW -
GDSTW-1 12 MW nominal: 13 MW -
GDSTW-1 0 MW nominal: 13 MW -
92 MW installed: 165 MW -
115 MW installed: 165 MW -
GNFSW-1 54 MW nominal: 100 MW -
GNFSW-2 38 MW nominal: 65 MW -
GNFSW-1 62 MW nominal: 100 MW -
GNFSW-2 53 MW nominal: 65 MW -
337 MW installed: 668 MW -
299 MW installed: 668 MW -
GRGBW-1 105 MW nominal: 334 MW -
GRGBW-2 120 MW nominal: 167 MW -
GRGBW-3 112 MW nominal: 167 MW -
GRGBW-1 129 MW nominal: 334 MW -
GRGBW-2 31 MW nominal: 167 MW -
GRGBW-3 139 MW nominal: 167 MW -
51 MW installed: 126 MW -
46 MW installed: 126 MW -
HRSTW-1 51 MW nominal: 126 MW -
HRSTW-1 46 MW nominal: 126 MW -
12 MW installed: 67 MW -
1 MW installed: 67 MW -
KILBW-1 12 MW nominal: 67 MW -
KILBW-1 1 MW nominal: 67 MW -
466 MW installed: 720 MW -
585 MW installed: 720 MW -
LARYO-1 116 MW nominal: 180 MW -
LARYO-2 108 MW nominal: 180 MW -
LARYO-3 121 MW nominal: 180 MW -
LARYO-4 121 MW nominal: 180 MW -
LARYO-1 138 MW nominal: 180 MW -
LARYO-2 143 MW nominal: 180 MW -
LARYO-3 153 MW nominal: 180 MW -
LARYO-4 151 MW nominal: 180 MW -
18 MW installed: 69 MW -
3 MW installed: 69 MW -
LCLTW-1 18 MW nominal: 69 MW -
LCLTW-1 3 MW nominal: 69 MW -
53 MW installed: 76 MW -
13 MW installed: 76 MW -
MDHLW-1 53 MW nominal: 76 MW -
MDHLW-1 13 MW nominal: 76 MW -
22 MW installed: 65 MW -
10 MW installed: 65 MW -
MILWW-1 22 MW nominal: 65 MW -
MILWW-1 10 MW nominal: 65 MW -
36 MW installed: 38 MW -
11 MW installed: 38 MW -
MINSW-1 36 MW nominal: 38 MW -
MINSW-1 11 MW nominal: 38 MW -
0 MW installed: 53 MW -
0 MW installed: 53 MW -
NOVAW-1 unknown nominal: 17 MW -
NOVAW-2 unknown nominal: 36 MW -
NOVAW-1 unknown nominal: 17 MW -
NOVAW-2 unknown nominal: 36 MW -
136 MW installed: 150 MW -
80 MW installed: 150 MW -
OMNDO-1 136 MW nominal: 150 MW -
OMNDO-1 80 MW nominal: 150 MW -
64 MW installed: 70 MW -
0 MW installed: 70 MW -
PAUHW-1 64 MW nominal: 70 MW -
PAUHW-1 unknown nominal: 70 MW -
162 MW installed: 228 MW -
0 MW installed: 228 MW -
PNYCW-1 162 MW nominal: 228 MW -
PNYCW-1 unknown nominal: 228 MW -
485 MW installed: 565 MW -
246 MW installed: 565 MW -
RCBKO-1 226 MW nominal: 279 MW -
RCBKO-2 260 MW nominal: 286 MW -
RCBKO-1 112 MW nominal: 279 MW -
RCBKO-2 134 MW nominal: 286 MW -
20 MW installed: 90 MW -
46 MW installed: 90 MW -
RREW-1 20 MW nominal: 90 MW -
RREW-1 46 MW nominal: 90 MW -
13 MW installed: 90 MW -
43 MW installed: 90 MW -
RRWW-1 13 MW nominal: 90 MW -
RRWW-1 43 MW nominal: 90 MW -
0 MW installed: 24 MW -
0 MW installed: 24 MW -
RSHLW-1 unknown nominal: 24 MW -
RSHLW-1 unknown nominal: 24 MW -
0 MW installed: 8 MW -
0 MW installed: 8 MW -
SANDW-1 unknown nominal: 8 MW -
SANDW-1 unknown nominal: 8 MW -
119 MW installed: 314 MW -
128 MW installed: 314 MW -
SHRSO-1 52 MW nominal: 157 MW -
SHRSO-2 67 MW nominal: 157 MW -
SHRSO-1 56 MW nominal: 157 MW -
SHRSO-2 71 MW nominal: 157 MW -
0 MW installed: 13 MW -
0 MW installed: 13 MW -
TANGW-1 unknown nominal: 13 MW -
TANGW-1 unknown nominal: 13 MW -
10 MW installed: 28 MW -
1 MW installed: 28 MW -
TDBNW-1 10 MW nominal: 28 MW -
TDBNW-1 1 MW nominal: 28 MW -
116 MW installed: 300 MW -
0 MW installed: 300 MW -
THNTO-1 58 MW nominal: 150 MW -
THNTO-2 58 MW nominal: 150 MW -
THNTO-1 unknown nominal: 150 MW -
THNTO-2 unknown nominal: 150 MW -
9 MW installed: 25 MW -
4 MW installed: 25 MW -
TULWW-2 9 MW nominal: 25 MW -
TULWW-2 4 MW nominal: 25 MW -
0 MW installed: 382 MW -
0 MW installed: 382 MW -
WDNSW-1 unknown nominal: 191 MW -
WDNSW-2 unknown nominal: 191 MW -
WDNSW-1 unknown nominal: 191 MW -
WDNSW-2 unknown nominal: 191 MW -
152 MW installed: 560 MW -
142 MW installed: 560 MW -
WHILW-1 82 MW nominal: 322 MW -
WHILW-2 70 MW nominal: 238 MW -
WHILW-1 78 MW nominal: 322 MW -
WHILW-2 64 MW nominal: 238 MW -
1,006 MW installed: 366 MW -
854 MW installed: 366 MW -
WLNYO-2 183 MW nominal: 183 MW -
WLNYW-1 181 MW nominal: 183 MW -
WLNYO-3 327 MW nominal: 330 MW -
WLNYO-4 315 MW nominal: 329 MW -
WLNYO-2 169 MW nominal: 183 MW -
WLNYW-1 130 MW nominal: 183 MW -
WLNYO-3 303 MW nominal: 330 MW -
WLNYO-4 251 MW nominal: 329 MW -
Power Station - PumpedStorage
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - PumpedStorage
Actual Power
14 November 2019 00:00:00
CO2 emissions
0 MW installed: 440 MW -
42 MW installed: 440 MW -
CRUA-1 0 MW nominal: 120 MW -
CRUA-2 0 MW nominal: 120 MW -
CRUA-3 0 MW nominal: 100 MW -
CRUA-4 0 MW nominal: 100 MW -
CRUA-1 21 MW nominal: 120 MW -
CRUA-2 22 MW nominal: 120 MW -
CRUA-3 0 MW nominal: 100 MW -
CRUA-4 0 MW nominal: 100 MW -
-1,370 MW installed: 2,016 MW -
42 MW installed: 2,016 MW -
DINO-1 -274 MW nominal: 336 MW -
DINO-2 -274 MW nominal: 336 MW -
DINO-3 0 MW nominal: 336 MW -
DINO-4 -274 MW nominal: 336 MW -
DINO-5 -274 MW nominal: 336 MW -
DINO-6 -274 MW nominal: 336 MW -
DINO-1 0 MW nominal: 336 MW -
DINO-2 0 MW nominal: 336 MW -
DINO-3 0 MW nominal: 336 MW -
DINO-4 0 MW nominal: 336 MW -
DINO-5 42 MW nominal: 336 MW -
DINO-6 0 MW nominal: 336 MW -
-73 MW installed: 384 MW -
25 MW installed: 384 MW -
FFES-1 0 MW nominal: 96 MW -
FFES-2 0 MW nominal: 96 MW -
FFES-3 0 MW nominal: 96 MW -
FFES-4 -73 MW nominal: 96 MW -
FFES-1 unknown nominal: 96 MW -
FFES-2 unknown nominal: 96 MW -
FFES-3 15 MW nominal: 96 MW -
FFES-4 10 MW nominal: 96 MW -
0 MW installed: 320 MW -
0 MW installed: 320 MW -
FOYE-1 0 MW nominal: 160 MW -
FOYE-2 0 MW nominal: 160 MW -
FOYE-1 unknown nominal: 160 MW -
FOYE-2 unknown nominal: 160 MW -
Power Station - Hydro
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - Hydro
Actual Power
14 November 2019 00:00:00
CO2 emissions
5 MW installed: 98 MW -
2 MW installed: 98 MW -
AIGA-1 unknown nominal: 10 MW -
AIGA-2 unknown nominal: 10 MW -
CAS-BEU01 5 MW nominal: 98 MW -
CULL-1 unknown nominal: 2 MW -
CULL-2 unknown nominal: 18 MW -
DEAN-1 unknown nominal: 19 MW -
DEAN-2 unknown nominal: 19 MW -
KIOR-1 unknown nominal: 10 MW -
KIOR-2 unknown nominal: 10 MW -
AIGA-1 unknown nominal: 10 MW -
AIGA-2 unknown nominal: 10 MW -
CAS-BEU01 2 MW nominal: 98 MW -
CULL-1 unknown nominal: 2 MW -
CULL-2 unknown nominal: 18 MW -
DEAN-1 unknown nominal: 19 MW -
DEAN-2 unknown nominal: 19 MW -
KIOR-1 unknown nominal: 10 MW -
KIOR-2 unknown nominal: 10 MW -
3 MW installed: 79 MW -
0 MW installed: 79 MW -
CAS-CLU01 3 MW nominal: 77 MW -
CLUN-1 unknown nominal: 21 MW -
CLUN-2 unknown nominal: 21 MW -
CLUN-3 unknown nominal: 21 MW -
PITL-1 unknown nominal: 8 MW -
PITL-2 unknown nominal: 8 MW -
CAS-CLU01 unknown nominal: 77 MW -
CLUN-1 unknown nominal: 21 MW -
CLUN-2 unknown nominal: 21 MW -
CLUN-3 unknown nominal: 21 MW -
PITL-1 unknown nominal: 8 MW -
PITL-2 unknown nominal: 8 MW -
2 MW installed: 89 MW -
34 MW installed: 89 MW -
CAS-CON01 2 MW nominal: 87 MW -
LUIC-1 unknown nominal: 18 MW -
LUIC-2 unknown nominal: 18 MW -
MOSS-1 unknown nominal: 7 MW -
MOSS-2 unknown nominal: 12 MW -
ORRI-1 unknown nominal: 18 MW -
TORA-1 unknown nominal: 8 MW -
TORA-2 unknown nominal: 8 MW -
CAS-CON01 34 MW nominal: 87 MW -
LUIC-1 unknown nominal: 18 MW -
LUIC-2 unknown nominal: 18 MW -
MOSS-1 unknown nominal: 7 MW -
MOSS-2 unknown nominal: 12 MW -
ORRI-1 unknown nominal: 18 MW -
TORA-1 unknown nominal: 8 MW -
TORA-2 unknown nominal: 8 MW -
0 MW installed: 39 MW -
1 MW installed: 39 MW -
CAS-GAR01 0 MW nominal: 39 MW -
INGA-1 unknown nominal: 20 MW -
QUOI-1 unknown nominal: 19 MW -
CAS-GAR01 1 MW nominal: 39 MW -
INGA-1 unknown nominal: 20 MW -
QUOI-1 unknown nominal: 19 MW -
0 MW installed: 61 MW -
0 MW installed: 61 MW -
CASH-1 unknown nominal: 11 MW -
CAS-KIL01 0 MW nominal: 60 MW -
LOCH-1 unknown nominal: 23 MW -
LOCH-2 unknown nominal: 23 MW -
LUBR-1 unknown nominal: 4 MW -
CASH-1 unknown nominal: 11 MW -
CAS-KIL01 0 MW nominal: 60 MW -
LOCH-1 unknown nominal: 23 MW -
LOCH-2 unknown nominal: 23 MW -
LUBR-1 unknown nominal: 4 MW -
2 MW installed: 79 MW -
19 MW installed: 79 MW -
CAS-MOR01 2 MW nominal: 78 MW -
CEAN-1 unknown nominal: 17 MW -
CEAN-2 unknown nominal: 4 MW -
GLEN-1 unknown nominal: 20 MW -
GLEN-2 unknown nominal: 20 MW -
LIVI-1 unknown nominal: 18 MW -
CAS-MOR01 19 MW nominal: 78 MW -
CEAN-1 unknown nominal: 17 MW -
CEAN-2 unknown nominal: 4 MW -
GLEN-1 unknown nominal: 20 MW -
GLEN-2 unknown nominal: 20 MW -
LIVI-1 unknown nominal: 18 MW -
0 MW installed: 11 MW -
0 MW installed: 11 MW -
CASS-1 unknown nominal: 3 MW -
CASS-2 unknown nominal: 8 MW -
CASS-1 unknown nominal: 3 MW -
CASS-2 unknown nominal: 8 MW -
0 MW installed: 44 MW -
0 MW installed: 44 MW -
CLAC-1 0 MW nominal: 44 MW -
CLAC-1 0 MW nominal: 44 MW -
0 MW installed: 75 MW -
0 MW installed: 75 MW -
ERRO-1 0 MW nominal: 25 MW -
ERRO-2 0 MW nominal: 25 MW -
ERRO-3 0 MW nominal: 25 MW -
ERRO-1 0 MW nominal: 25 MW -
ERRO-2 unknown nominal: 25 MW -
ERRO-3 0 MW nominal: 25 MW -
7 MW installed: 75 MW -
15 MW installed: 75 MW -
FASN-1 0 MW nominal: 22 MW -
FASN2 0 MW nominal: 23 MW -
FASN3 0 MW nominal: 22 MW -
FASN-4 7 MW nominal: 8 MW -
FASN-1 7 MW nominal: 22 MW -
FASN2 0 MW nominal: 23 MW -
FASN3 unknown nominal: 22 MW -
FASN-4 8 MW nominal: 8 MW -
0 MW installed: 17 MW -
0 MW installed: 17 MW -
FINL-1 0 MW nominal: 17 MW -
FINL-1 0 MW nominal: 17 MW -
0 MW installed: 999 MW -
0 MW installed: 999 MW -
GAUR-1 unknown nominal: unknown -
GAUR-1 unknown nominal: unknown -
0 MW installed: 100 MW -
0 MW installed: 100 MW -
GLNDO-1 0 MW nominal: 100 MW -
GLNDO-1 0 MW nominal: 100 MW -
0 MW installed: 34 MW -
0 MW installed: 34 MW -
GRUB-1 unknown nominal: 17 MW -
GRUB-2 unknown nominal: 17 MW -
GRUB-1 unknown nominal: 17 MW -
GRUB-2 unknown nominal: 17 MW -
0 MW installed: 25 MW -
0 MW installed: 25 MW -
INAW-1 unknown nominal: 25 MW -
INAW-1 unknown nominal: 25 MW -
0 MW installed: 999 MW -
0 MW installed: 999 MW -
LAIG-1 unknown nominal: unknown -
LAIG-1 unknown nominal: unknown -
0 MW installed: 999 MW -
0 MW installed: 999 MW -
LOCG-1 unknown nominal: unknown -
LOCG-1 unknown nominal: unknown -
0 MW installed: 15 MW -
0 MW installed: 15 MW -
NANT-1 0 MW nominal: 15 MW -
NANT-1 0 MW nominal: 15 MW -
0 MW installed: 51 MW -
0 MW installed: 51 MW -
RANN-1 unknown nominal: 17 MW -
RANN-2 unknown nominal: 17 MW -
RANN-3 unknown nominal: 17 MW -
RANN-1 unknown nominal: 17 MW -
RANN-2 unknown nominal: 17 MW -
RANN-3 unknown nominal: 17 MW -
0 MW installed: 20 MW -
0 MW installed: 20 MW -
SFIL-1 unknown nominal: 20 MW -
SFIL-1 unknown nominal: 20 MW -
0 MW installed: 24 MW -
0 MW installed: 24 MW -
SHIN-1 unknown nominal: 12 MW -
SHIN-2 unknown nominal: 12 MW -
SHIN-1 unknown nominal: 12 MW -
SHIN-2 unknown nominal: 12 MW -
0 MW installed: 153 MW -
0 MW installed: 153 MW -
SLOY-1 0 MW nominal: 40 MW -
SLOY-2 0 MW nominal: 40 MW -
SLOY-3 0 MW nominal: 40 MW -
SLOY-4 0 MW nominal: 33 MW -
SLOY-1 0 MW nominal: 40 MW -
SLOY-2 0 MW nominal: 40 MW -
SLOY-3 0 MW nominal: 40 MW -
SLOY-4 unknown nominal: 33 MW -
0 MW installed: 999 MW -
0 MW installed: 999 MW -
SROM-1 unknown nominal: unknown -
SROM-1 unknown nominal: unknown -
0 MW installed: 1,998 MW -
0 MW installed: 1,998 MW -
STVE-1 unknown nominal: unknown -
STVE-2 unknown nominal: unknown -
STVE-1 unknown nominal: unknown -
STVE-2 unknown nominal: unknown -
0 MW installed: 40 MW -
0 MW installed: 40 MW -
TUMB-1 unknown nominal: 20 MW -
TUMB-2 unknown nominal: 20 MW -
TUMB-1 unknown nominal: 20 MW -
TUMB-2 unknown nominal: 20 MW -
Power Station - Other
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - Other
Actual Power
14 November 2019 00:00:00
CO2 emissions
55 MW installed: 55 MW -
54 MW installed: 55 MW -
MARK-1 55 MW nominal: 55 MW -
MARK-1 54 MW nominal: 55 MW -
0 MW installed: 45 MW -
0 MW installed: 45 MW -
STCR-1 unknown nominal: 45 MW -
STCR-1 unknown nominal: 45 MW -
Power Station - Unknown
Predicted Power
21 November 2019 03:27:43
CO2 emissions
Power Station - Unknown
Actual Power
14 November 2019 00:00:00
CO2 emissions
0 MW installed: 910 MW -
128 MW installed: 910 MW -
CARR-1 0 MW nominal: 455 MW -
CARR-2 0 MW nominal: 455 MW -
CARR-1 106 MW nominal: 455 MW -
CARR-2 22 MW nominal: 455 MW -
138 MW installed: 219 MW -
42 MW installed: 219 MW -
HMGTO-1 70 MW nominal: 108 MW -
HMGTO-2 68 MW nominal: 111 MW -
HMGTO-1 42 MW nominal: 108 MW -
HMGTO-2 unknown nominal: 111 MW -
0 MW installed: 500 MW -
0 MW installed: 500 MW -
IIG-CNGS1 unknown nominal: 500 MW -
IIG-CNGS1 unknown nominal: 500 MW -
0 MW installed: 500 MW -
0 MW installed: 500 MW -
IMG-CNGS1 unknown nominal: 500 MW -
IMG-CNGS1 unknown nominal: 500 MW -
270 MW installed: 133 MW -
226 MW installed: 133 MW -
LNMTH-1 135 MW nominal: 133 MW -
LNMTH-2 135 MW nominal: 133 MW -
LNMTH-3 0 MW nominal: 133 MW -
LNMTH-1 128 MW nominal: 133 MW -
LNMTH-2 99 MW nominal: 133 MW -
LNMTH-3 0 MW nominal: 133 MW -
189 MW installed: 210 MW -
90 MW installed: 210 MW -
WTMSO-1 189 MW nominal: 210 MW -
WTMSO-1 90 MW nominal: 210 MW -